LONG LEAD
Definition
Long Lead
long lead means long lead. An equipment item requiring a long assembly or delivery time, therefore needing to be ordered a long time in advance of required delivery date (used in projects)
✓ Verified term
Long Lead
long lead means long lead. An equipment item requiring a long assembly or delivery time, therefore needing to be ordered a long time in advance of required delivery date (used in projects)